August 11th 2018, 3h
Riveting the back of vertical stabilizer
The countersinking was done in the wrong side. So, we need to redo the back of the vertical stabilizer.
August 5th 2017, 8h
Debuting, priming, and starting to river vertical stabilizer

July 29th 2018, 6h
Fluting and straitening
Drilling spars, ribs and skin


