We finished the elevator skeleton riveting.
We riveted the elevator skeleton to the skin. We missed putting RTV at the trailing edge where the stiffeners meet, which is because it was not specified in the instruction, but it is recommended by Van. I checked with Van and they said that it is ok to proceed and that the elevator is air worthy without the RTV.
We still need to do few rivets that can not be reached with the pneumatic or back riveting, I am ordering some more flash pop rivets for those.
We started working on the trim tab:
- Match drilling
- Deburing
- Dimpling