October 6th, 4h
After flipping the tank, we proceeded with the fabrication of the bellcrank linkages:
As well, we started working on the aileron brackets for both wings:
After flipping the tank, we proceeded with the fabrication of the bellcrank linkages:
As well, we started working on the aileron brackets for both wings: