November 30th, December 1st, 14h
We continued on riveting the bottom skin for the right wing. We nearly finished the whole bottom skin, at the exception of the last 2 raws. We ended up having a little incident, dropping the bucking bar inside, we decided to check with Vans before continued.
Then we moved on to the left wing and riveted the whole left bottom wing skin. As well, we finalized the pitot tube installation.
Before closing in the wing. We took pictures of the serial number of the hardware inside.