Bulkhead 704

February 9th and 16th, 16h

Next we started working on the bulkhead. First drilling holes for the bushings.  Then drilling the center sections to the sides.  Afterwards, fabricating the control brackets and drilling them.

IMG_1905.jpg

Next weekend, we primed the control brackets and fitted the control sticks.  Then we attached the platenuts.  Afterwards we worked on the cover ribs.  The center bushing holes ended up a bit larger, 9/16 instead of 7/16, so I am most likely redoing those ribs after checking with Vans.

IMG_1907.jpg

Firewall

January 26th, Feb 2nd 15h

We started working on the fuselage.  The first part is the firewall.  Which is made from stainless steel. It had very sharp edges, so we needed to be very careful in smoothing the edges.  Then we prepped the firewall and all the stiffeners that attaches to it, matched drilled, deburred, dimpled and counter sink as needed.
IMG_1900.jpg

The next weekend, we primed and riveted all the parts, except for the aux fuel pump doubler.  We don’t need this part for fuel injected engines. Also, the firewall recess was not riveted for the time being, so that we have access.

IMG_1904.jpg

IMG_1903.jpg

Finishing the wings

January 19th, 8.5h

Final touch-ups on the wings.

We drilled the inboard bracket for the flap hinge, drove the hinge through the hole and bent the flap hinge.  This finalized the flap installation.

We drilled the wing tips.  We were thinking of going all the way to installing all the platenuts, but after consulting with Vans, they suggested waiting on the platenuts until attaching the wings to the fuselage.  This way, I will be able to get a better alignment of the wing tips with the neutral position.

IMG_1888.jpg

Then we installed all the access plates. The wings are complete for the time being

IMG_1890.jpg

IMG_1891.jpg

Finishing wing lights and lens

January 12th, 9h

We finished installing the lights into the wing tips.  We had to make some small adjustment to the wing tips for a smooth insertion of the lights.  Then we riveted the plate nuts, and attached the lights.

Afterwards, we moved to the lens.  We did a rough cut of the lens, then we set each half on top of its wing tip, and traced a contour to follow.  Based on the contour, we cut he lens using snips, then we sanded it to get a nice finish.

Afterward, to attach the lens to the wing tip, we decided to go with 2 plate nuts per lens.  we match drilled the lens to the wing tip, then we drilled the rest of the holes for the plate nuts and riveted it.  Finally we attached the lens to the wing tip.  The result looks great.

IMG_1874.jpg  IMG_1875.jpg

IMG_1878.jpgIMG_1877.jpg

Finishing install of right flap

January 1st, 3h

After further Analysis of the alignment of the flap hinge attached to the skin, we realized that we can just adjust the teeth of the hinge.  The adjustments were very small, then we tested attaching the right flap.  We went through few trials, until we got to the desired results, the pin can easily flow between the 2 parts of the hinge.  The flap was attached and the motion is pretty smooth. The wing looks complete, only couple items remaining.

IMG_1881.jpg

IMG_1879.jpg

Finishing Wing Riveting

January 1st, 5h

Today, we finished the wing skin riveting.

First, we fixed the little dent in the left leading edge following Vans instructions by forming a piece of wood to fill the leading edge from the inside and using a mallet, carefully fixing the dent.  Then, we finished the last panels of riveting in the left wing.

IMG_1884.jpg

Afterward, we moved on to riveting the plate nuts for all the access panels.

IMG_1880.jpg

IMG_1883.jpg

 

Airplane Move

December 28th, January 4th, 18h

We are moving from Half Moon Bay to Richmond.  So, I had to plan the airplane move:

  • Both airplane insurance for ground, non-motion, which means the plane is uncovered when it is not moving under its own power.
  • Rented a 20ft U-haul.
  • Packed all the part of the fuselage and finishing kits back in their original crates.
  • With the help of friends, we carried and retrained all the parts of the tail, the wings and the crates into the U-haul.
  • We drove the U-haul and unpacked.  All the parts arrived in great condition.  Not a single damage. Great success.
  • We setup the plane and the shop in the new garage, it looks great.  I am looking forward to continuing the build and moving on to the fuselage.

IMG_1854.jpg

IMG_1858.jpg

IMG_1885.jpg

Access pannels

December 22nd, 4h

The wings are very close to complete, just few items left.  So, I decided to install the  the access panels, so that I can close the wings:

  • Match drilling access panels to wing bottom kin
  • Match drilling access panels to planetenuts
  • deburing
  • dimpling
  • Priming

IMG_1806.jpg

What left is to rivet the platenuts to the bottom Skins, then to screw the access panels

Attaching flaps and ailerons

December 13th, 14th, 10h

I riveted the flap to the right wing, which went great.  It is great to see both the flap and aileron on and rotating.

IMG_1804.jpg

Then I moved to the left wing.  For this one, I had to redo the hinge, since the holes in the previous hinge did not end up having edge distance. After redoing all the drilling, deburring and dimpling, I was finally able to rivet the hinge.  However this hinge did not end up being perfectly straight, because of some enlarged holes for which there was no access to enlarge the countersink.  So, I waiting to hear from Vans about this one:

IMG_1802.jpg

So, I switch to working in the aileron and bell-crank. I redid the bell-crank since in the previous one the riveting of the end did not go great. Redoing the bell-crank went smoothly,  then I attached the bell-crank to the aileron.  Now the aileron for the left wing is moving great as well.

IMG_1805.jpg